Process water dam maintenance
Stormwater cut-off canal
CC5 was used to remediate a failing irrigation canal in KZN
Emergency Remediation of 25 year old concrete canal

CC8 was used to line a series of canals along a railway.

CC8 was used to line outfall drainage canals on a railway batter and direct water into the existing ditches at the toe of the embankment.

CC13 used to line a drainage ditch to prevent erosion.

CC13 used to line a series of drainage canals at a landfill site in South Wales.

CC8 used to provide scour protection to a series of mine water drainage channels in South Wales.

CC13 used to provide scour protection to a series of spoil tip drainage channels at a former colliery site in South Wales.

CC8 was used to line an earth canal on a slope next to a railway line.

CC13 was used to create better water management system.

CC5 was used to remediate an failing irrigation channel.

CC8 used to collect water contaminated with sulphuric acid and direct it towards holding pits for later treatment.

CC13 was used to line drainage canals and a drainage lagoon constructed to decant alkaline mine water.

CC5 was used to line a lagoon constructed to collect contaminated water from the nearby mining activity.